This post is for anyone who sends purchase orders from a Word document, an email or a spreadsheet tab, and wants to know whether the template is missing something.

The short answer: a purchase order has three jobs. It tells the supplier exactly what you want, it records what you agreed (so you can check the bill against it), and it gives your own team something to receive against. A field belongs on the PO if it serves one of those three jobs. Below is the full template, then an example, then the five fields small businesses most often leave out.

The Template

Header

Field Why it is there
PO number Unique, sequential. The supplier puts it on the delivery note and the bill, which is how you match them later
PO date Starts the lead-time clock
Your company name, address, tax ID Legally needed on many bills; tells the supplier who is buying
Supplier name, address, tax ID So there is no doubt which entity you are buying from
Supplier contact Who you are dealing with
Your contact (buyer) Who the supplier calls with questions
Delivery address Which warehouse or site, if you have more than one
Requested delivery date When you need it
Payment terms For example, 30 days from invoice. Agreed now, not argued later
Delivery terms Who pays freight, who owns the goods in transit (for example, delivered to your door, or ex works)
Currency Essential if you buy from abroad
Reference The customer order or project this is for, if any

Lines

Field Why it is there
Line number So "line 3 was short" means one thing
Your item code How your team identifies it
Supplier's item code How the supplier identifies it. Prevents the wrong variant
Description Size, grade, colour, specification. Enough that a stranger would pick the right item
Quantity The number ordered
Unit of measure Units, boxes of 50, metres, kilograms. Never leave it implied
Unit price Agreed price per unit of measure
Discount If any, per line
Tax rate Per line, since rates can differ
Line total Quantity x unit price, after discount, before tax
Requested date per line If lines are needed at different times

Footer

Field Why it is there
Subtotal, tax, total The amount you are committing
Approved by, date Proves the spend was authorised
Special instructions Packing, labelling, certificates required, delivery hours
Terms reference Link to your standard purchase terms, if you have them

A Filled-In Example

PO-2026-0187, dated 6 October 2026

Supplier: a regional steel stockist. Delivery to: Warehouse 2. Requested: 17 October. Payment: 30 days from invoice. Delivery: delivered, supplier pays freight. Currency: KRW. Reference: customer order SO-0912.

Line Our code Supplier code Description Qty Unit Unit price Line total
1 ST-FB-50x6 FB506-6M Flat bar, mild steel, 50 x 6 mm, 6 m lengths 40 length 21,500 860,000
2 ST-RB-20 RB20-6M Round bar, mild steel, 20 mm, 6 m lengths 25 length 18,200 455,000
3 ST-PL-3 PL3-1225 Plate, mild steel, 3 mm, 1250 x 2500 6 sheet 96,000 576,000

Approved by: operations manager, 6 October. Special instructions: mill certificates required for line 3. Deliveries 8:00 to 16:00 only.

Notice what makes this PO checkable later: the unit is a length or a sheet, not "pcs"; the supplier code removes doubt about the variant; and the reference to SO-0912 tells your team which customer is waiting.

The Five Fields Small Businesses Leave Out

1. Unit of measure. "40" of what? Forty 6-metre lengths, or forty metres? This one field causes more receiving errors and billing disputes than any other.

2. Supplier's item code. Your description says "M8 bolt." The supplier stocks twelve kinds. Their code removes the guess.

3. Delivery terms. If the PO does not say who pays freight, the freight shows up on the bill and you either pay it or argue about it.

4. The customer order reference. Without it, when the PO is late, nobody can say which customer to call.

5. Approval. A PO with no recorded approval is a spend nobody can trace back to a decision.

What the Template Cannot Do

A template records what you asked for. It cannot record what happened next, and that is where the money is:

Those are tracked after the PO is sent. The process is in how to track purchase orders from creation to delivery, and the controls in procure-to-pay explained.

How Purchase Orders Work in Loopency

Every field above is on a Loopency purchase order, and the record carries on after the PO is sent:

Where to Start

Compare your current PO template with the tables above and add the five fields if they are missing. That alone will cut receiving errors. If you want the PO to carry on after it is sent, start a free Loopency workspace, bring in your suppliers and items, and raise your next real PO there.

Raise your next PO in Loopency

#purchasing#suppliers#excel

Related reading

Ready to try Loopency?

Build powerful apps without code. Start your trial today.

Start trial
Purchase Order Template: What Every Business Should Track